Start with the utility’s demand rule and the facility’s interval data. The highest monthly demand on an invoice tells you how large the billed peak was; it does not show whether the site stayed near that level for 15 minutes or two hours. That difference changes the battery’s required energy, even when both sites want the same reduction in billed demand.
This guide is for behind-the-meter projects in which a battery reduces grid import during selected demand periods. It describes an initial engineering screen, not a savings forecast or a substitute for a tariff review.

Use the meter interval the tariff actually bills
Ask the utility or facility team for the interval import series, the tariff and sample invoices. Verify the demand averaging period, whether it is based on fixed or rolling intervals, applicable time windows and any ratchet or minimum billed demand. Treat 15-minute intervals as an example, not a universal rule.
If the file contains kWh per 15-minute interval, divide by 0.25 hours to obtain average kW for that interval. For example, 55 kWh during a quarter hour means an average import of 220 kW. If the file already contains average kW, do not apply that conversion. Check for missing records and timestamp shifts before comparing the series to the bill.
Use the relevant import at the utility meter. For a site with solar, the load seen by the meter is affected by generation as well as facility use. Match the baseline to the proposed controls and avoid subtracting existing solar generation a second time.
Calculate both the depth and duration of a peak
Choose a candidate import ceiling for the billed window. The battery’s required output for each interval is the amount by which baseline import exceeds that ceiling. The largest difference is a first-pass kW requirement. Multiply the differences by the interval durations and add them to find the kWh that must reach the AC side before charging is available again.
Here is a simple example with a target of 180 kW, using four consecutive 15-minute intervals:
| Interval | Baseline import | Required battery output | Delivered energy |
|---|---|---|---|
| 14:00 | 184 kW | 4 kW | 1.0 kWh |
| 14:15 | 206 kW | 26 kW | 6.5 kWh |
| 14:30 | 220 kW | 40 kW | 10.0 kWh |
| 14:45 | 198 kW | 18 kW | 4.5 kWh |
| This event | 40 kW maximum | 22.0 kWh total |
Those numbers describe the load trace, not a recommended battery nameplate. For comparison, a 205 kW plateau lasting two hours would require 25 kW but 50 kWh at the same ceiling. The lower peak needs more energy. Focusing on the highest demand alone would miss that difference.
Interval averages are appropriate for this illustrative billing screen. They do not resolve short equipment transients or prove that the inverter and control system can track changes within an interval.
Check what happens between two peaks
If two 22 kWh events can occur before recharge, the battery may have to deliver up to 44 kWh at the AC boundary. A gap in production does not mean the battery can fully recover. If only 8 kW of additional grid import is available for 90 minutes, the gap permits at most 12 kWh of AC charging input before conversion and standby losses. Some of that input may also fall in an expensive or demand-sensitive period. Do not subtract the full 12 kWh from the discharge requirement as if it were recovered output.
Run the dispatch against representative months, including seasonal peaks, shift changes, solar variability and atypical operating days. Reserve enough energy for any separately agreed backup purpose. Compare several demand targets and check charge limits, usable energy, reserve and degradation assumptions. The System Advisor Model battery storage documentation describes peak-shaving and tariff-aware dispatch options for this type of analysis.
What to send with a project brief
Share the interval data, tariff, meter boundary, proposed import target, charging restrictions and any backup reserve. Ask the supplier to show an interval trace of import with and without storage, plus the battery state of charge and the intervals where it could not hold the target. That trace is easier to review than an annual savings percentage on its own.
For equipment and project context, see Green Batt’s commercial energy storage application guide.
Frequently Asked Questions
Can I size peak shaving from one monthly invoice?
Use the bill to identify the tariff and billed demand. Use interval data to size the system; the bill alone does not show the event shape or recharge opportunities.
Does a 40 kW battery guarantee a 40 kW reduction in billed demand?
No. It needs sufficient usable energy and must dispatch in the right intervals. A later uncontrolled peak, a different tariff window or a billing ratchet can change the result.
Can the same battery also provide backup power?
Potentially, if the system is designed for backup and enough charge is reserved. Dispatch that uses the reserve for peak shaving reduces what remains available during an outage.
Need help with a similar request?
Share your product requirements, timeline and cooperation goals. We can help clarify the next step.